The Water and Sewer Department will be installing a water tap and sewer lateral to a property on the 400 block of Greene Road. The work will require the excavation of a trench about 13 feet in depth.
For the safety of the crew and traffic, the water department will close Greene Road between Bashor Road and Clinton Street to through traffic for four days starting 7 a.m. Tuesday, Sept. 11.
It is expected for the road to reopen for the weekend.